Installation guides
All tips for installing your Moroccan tiles.
1. Clean the entire surface with a degreaser such as TSP (trisodium phosphate). It is not recommended to use dish soap to clean the walls.
2. Mark your wall with a level line at the height of the first row of tiles to indicate where the top of your tile will align.
3. Remove the protective film from the back of your tile and apply it to your wall using the guideline.
4. Install the remaining tiles one at a time, making sure they are properly aligned, both in terms of pattern and grout. When aligning your tiles, overlap the letters/numbers along the grout lines to ensure they are not visible.

6. The installation will become permanent within 48 hours. Now you can enjoy your new decoration.

7. Note that you can also install your Moroccan tiles vertically by starting on the left or right side!
Note: The letters/numbers printed on the Smart Tiles are for production purposes only. To determine the desired pattern for your Smart Tiles, we recommend laying them out on your countertop before installing them on the wall. When aligning your tiles, make sure the letters/numbers overlap along the grout lines to ensure they are not visible.
About our Smart Adhesive: Does our adhesive technology seem insufficiently adhesive? That's simply because it's not designed to stick to your skin! We designed it so you can reposition the tiles during installation, and it will bond permanently to the wall within 48 hours of application. If possible, avoid touching the adhesive with your fingers during installation. Press firmly once the tile is in the correct position, and you're ready to enjoy your new decor for years to come!
For FIREPLACES, Smart Tiles can be installed on a surface whose temperature does not exceed 49°C (120°F). It is important to avoid direct contact with a heat source and exposure to open flames.